Industrial Spray Work - Large Industrial Unit 'Blackout'

Industrial Spray Work – Large Industrial Unit ‘Blackout’

Project Overview

Complete spray finish application to new plasterboard walls and ceiling within a large industrial unit, creating a full blackout finish using specialist airless spray equipment.

Scope of Work

Application of spray finish to new plasterboard walls and ceiling surfaces throughout the industrial unit to achieve a professional matt black finish suitable for industrial requirements.

Equipment and Tools Utilised

Primary Equipment: Graco ST Max 2 Airless Spray Pump

Access Equipment: Scissor lift for ceiling and high wall access

Supporting Tools: Standard preparation and cleaning equipment

Materials Used

Paint System: Tikkurilla Vinyl Matt ‘Full Matt Black’

Preparation: 50% mistcoat solution (50% water, 50% paint)

Finish: Full strength topcoat application

Work Programme

Total Duration: 3 night shifts

Day 1 – Surface Preparation

Comprehensive dusting down of all surfaces

Removal of surface dust residue left from tape and jointing operations

Surface inspection and preparation for coating application

Day 2 – Mistcoat Application

Application of 50% mistcoat solution (50% water, 50% paint ratio)

Full coverage of prepared plasterboard surfaces

Quality control and coverage verification

Day 3 – Topcoat Application

Application of full strength Tikkurilla Vinyl Matt topcoat

Final inspection and touch-up work as required

Equipment cleaning and site clearance

Project Team

Personnel: 2-person spray team

Working Pattern: Night shifts to minimise disruption to industrial operations

Key Project Outcomes

Professional matt black finish achieved across all surfaces

Work completed within planned timeframe

Minimal disruption to ongoing industrial operations through night shift working

Full blackout specification met to client requirements

Duration

2 Days